Customer |
Project |
Scope of Work |
|
|
||
|
Agilent Technologies Manufacturing GmbH & Co. KG
|
Cleanroom extension
|
Complete cleanroom with ceiling, walls, Fan Filter Units, make-up AHU with automatic controls |
|
|
||
|
Alkor Folien GmbH
|
New Cleanroom Foil Extrusion Cleanroom area: 230 m² |
Cleanroom ceiling, cleanroom walls, HVAC with automatic controls |
|
|
||
|
Andor Technology
|
New Cleanroom
|
Cleanroom ceiling with Fan Filter Units, cleanroom walls, A/C with automatic controlls, ionisation system, pass thru´s |
|
|
||
|
Applied Materials
|
Thermal conditioning station for wordwide application |
Thermal conditioning station for tempering of glass panels for the productions of photovoltaic cells |
|
|
||
|
Ätztechnik Herz GmbH + Co.KG
|
Extension Production Building |
Cleanroom wall systems, cleanroom ceiling, Fan Filter units with automatic controls |
|
|
||
|
Carl Zeiss Aalen |
Cleanroom for coating of eyeglass lens |
Cleanroom ceiling, cleanroom walls, air showers, Fan-Filter-Units with cooling coil, HVAC-Systems with automatic controls |
|
|
||
|
Carl Zeiss Aalen |
Cleanroom for coating of eyeglass lens phase 1 +2 |
Cleanroom ceiling, cleanroom walls, air showers, Fan Filter Units with cooling coil, HVAC-Systems with automatic controls |
|
|
||
|
ESO
|
Cleanroom for assembly and testing of optical units etc. |
Cleanroom ceiling with Fan Filter Units, make-up air supply with automatic controls and control panel, nitrogen plant, clothes cupboards, PVC flooring |
|
|
||
|
ESO
|
Climate room for measurement equipment |
Cleanroom ceiling with Fan Filter Units, make-up air supply with automatic controls and control panel, nitrogen plant, clothes cupboards, PVC flooring |
|
|
||
|
Europrint KFT
|
Building for production with cleanroom area 650 ², officies and other rooms 5.000 m² |
Cleanroom ceiling with Fan Filter Units, cleanroom walls, material path-thrus, technical general contractor for A/C, heating-, cooling plant, sanitarian equipment and compressed air system |
|
|
||
|
Evonik Degussa GmbH
|
Cleanroom test laboratory |
Cleanroom ceiling, cleanroom walls, cleanroom flooring, steel construction, cooling plant, HVAC plant, Fan-Filter-Units, automatic controls, utility supplies |
|
|
||
|
FSG Facility Service GmbH |
Cleanroom building west, 4 th floor, Sputter |
Cleanroom ceiling with Fan Filter Units, cleanroom walls |
|
|
||
|
IBM Research GmbH |
New building Nanotec-center |
Cleanroom ceilign, cleanroom walls, fan-filter-units with cooling coil, air locks with interlock systems, particle monitoring system, hot- and cold water systems, PVC-flooring |
|
|
||
|
IC-Haus GmbH |
Extension Building 3, Cleanroom |
Complete cleanroom with ceiling and Fan Filter Units, walls with sliding doors, flooring, HVAC and cooling plant with automatic controls |
|
|
||
|
Initial Textil Service |
Extension cleanroom for cleanroom laundry |
Cleanroom ceiling with Fan Filter Unis with coolingcoil, cleanroom walls, cleanroom flooring, HVAC with auomatic controls, cooling plant |
|
|
||
|
Ites Vertriebs GmbH
Amstetten |
Cleanroom for printed circuit boards in Moscow |
Cleanroom ceiling, cleanroom walls, Fan Filter Units with cooling coil, A/C plant with automatic control system |
|
|
||
|
Kernforschungszentrum Karlsruhe
Eggenstein-Leopoldshafen |
Institute for Transuranium Elements |
Main constructor for the complete reconstruction with constructions works, cleanroom ceiling, Fan Filter Units with integrated cooling unit, cleanroom walls, raised floor, furniture for the changing rooms, automatic controls |
|
|
||
|
Manz Automation AG
|
Climatisation of laser protection cabins for the production of photovoltaic cells |
Complete climatisation of cabins with HVAC and control technology |
|
|
||
|
Micronas GmbH
|
Extension Bonden Phase 2 + 3, Building 6 Level 10
|
Reconstruction cleanroom ceiling, Fan Filter Units with cooling coil, glass skirting |
|
|
||
|
Nanoplus GmbH
|
Cleanroom for Nanotechnology |
Complete cleanroom with ceiling and FFUs, cleanroom walls, A/C and cooling plant with automatic control |
|
|
||
|
Netoptic GmbH
|
Production and storage cleanrooms for packing of optical cables |
Cleanroom ceiling with Fan Filter Units, Cleanroom walls, HVAC with automatic controls, cooling plant |
|
|
||
|
Norstel AB Linköping |
SIC-Factory |
Cleanroom ceiling, walls, Fan Filter Units with PC controls and cabeling, air shower |
|
|
||
|
NXP Semiconductors Germany GmbH (formerly Philips) Hamburg |
Extension of cleanroom for wafer production |
Cleanroom ceiling, FFUs, wall system, raised floor |
|
|
||
|
NXP Semiconductors Germany GmbH (formerly Philips) Hamburg |
Conversion cleanroom building L2 |
Cleanroom wals, cleanroom ceiling with Fan-Filter-Units, raised floor |
|
|
||
|
Osram Opto Semiconductors GmbH
|
Project CLC 1/5 |
Cleanroom ceiling with Fan Filter Units with cooling coil, cleanroom walls, HVAC with automatic controls, cooling plant |
|
|
||
|
Philips Semiconductor |
FAB extension Building L3 south |
Cleanroom ceiling with Fan Filter Units, cleanroom walls, raised floor, return air cooling units with piping, sprinkler system |
|
|
||
|
PZH Produktionstechnisches Zentrum Hannover |
Production Centre Hannover - PZH |
Cleanroom walls, cleanroom ceiling with Fan Filter Units with cooling coil, cleanroom floor, air shower, material pass-thrus |
|
|
||
|
Riyadh Cables |
Cleanroom fo CCV Line 5 + 6 |
Self supporting cleanroom construction with cleanroom walls, cleanroom ceiling, Fan Filter Units, HVAC with automatic controls, cooling plant |
|
|
||
|
Riyadh Cables |
Cleanroom fo CCV Line 4, 5 + 6 |
Self supporting cleanroom construction with cleanroom walls, cleanroom ceiling, Fan Filter Units, HVAC with automatic controls, cooling plant |
|
|
||
|
Robert Bosch GmbH Bamberg |
Extension of cleanroom Building Ba406 Cleanroom area: 90 m² |
Cleanroom ceiling with HEPA filteroutlets, cleanroom wall systems, cleanroom lighting |
|
|
||
|
TESAT-Spacecom |
Cleanroom for AIT-Optics, Building No. 023/4 Cleanroom area: 120 m² |
Cleanroom ceiling, Fan Filter Units, cleanroom walls, return air cooling units |
|
|
||
|
TESAT-Spacecom |
Extension Cleanroom for AIT-Optics, Building No. 023/4 Cleanroom area: 250 m² |
Cleanroom ceiling, Fan-Filter-Units with cooling coil, Cleanroom walls, HVAC sastem, automatic controls, air showers |
|
|
||
|
TESAT-Spacecom |
Cleanroom Building 7
|
Cleanroom ceiling with Fan-Filter-Units, cleanroom walls, HVAC plants with automatic controlls, utility pipework |
|
|
||
|
VEGA Grieshaber KG
|
Project CERTEC
|
Complete cleanroom with walls with sliding doors, ceiling with Fan-Filter-Units, air shower, HVAC-Systems with automatic controls |
|
|
||
|
Vishay Semiconductor |
Cleanroom extension IC-Wafer-Fab, Ground floor Cleanroom area: 100 m² |
Cleanroom ceiling with Fan Filter Units, cleanroom walls, A/C plant |
|
|
||
|
Wacker Chemie AG |
Cleanroom for test laboratory for silicium cells, building no. D34 Cleanroom area: 200 m² |
Cleanroom complete in synthetic design (PVC), cleanroom ceiling, cleanroom walls |